Walkover survey
A walkover survey is a basic site survey which can form part of the early site investigation process at the beginning of a project. It involves walking over the site and the surrounding area and recording any observed information which may be relevant to the project. It may be part a wider desk-based study of the site.
A walkover survey should highlight any immediately apparent geological, ecological, topographical or other issues which may present constraints to the project, such as; the presence of protected species, contamination, site obstructions, access problems, water sources, trees, site boundaries and so on. It may incorporate additional information gathered from local authorities, local residents and people who work in the vicinity of the site. It should identify any areas where further and potentially more detailed surveys may be necessary.
Wherever possible, any information prepared or obtained should be in a format which can be readily shared and used, and should be stored and named in a way consistent with the long-term project and operational needs.
A walkover survey will generally be followed by more specific site surveys.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
CIOB Art of Building 2024 judges choice winner
Once Upon a Pass by Liam Man.
CIOB Art of Building 2024 public choice winner
Fresco School by Roman Robroek.
HE expands finance alliance to boost SME house building
Project follows on from Habiko public-private place making pension partnership for affordable housing delivery.
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
How orchards can influence planning and development.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.